Carl Chaney took advantage of a GftK training day last year when he had 100m2 patio to install, including setts outlining the perimeter. “The GftK team arrived at eight sharp and were very professional and helpful with their teaching methods,” he says.
What he discovered was how easy the product is to use, how the look and colour suited the natural paving used, and how its self-levelling properties filled joints and voids evenly—all things you’ll find out without training, it’s true, but you can’t beat the watchful eye of an expert to give you confidence that you’re using the product to its best effect.
The whole area was completed in six hours, using two operatives. And if you’ve been wary of taking on a new product that is more expensive than traditional cement and sand, Carl also pointed out that, using the latter method, the area would have taken one to two weeks. “The extra cost [of GftK] is comfortably saved in labour costs,” he says.