Product Type | Pointing |
---|---|
Packaging | Multilayer paper bag |
Material Type | Cementitious coloured powder |
Country Of Origin | UK |
Application | External |
Application Method | Squeegee |
Weight | 25kg |
Application Surface Temperature | 5 - 30˚C |
Coverage | Refer to product calculator |
Curing Time | 4 hours @ 20˚C |
Storage & Shelf Life | Store in closed original container at temperatures between 5˚C and 30˚C. Avoid frost. This product must be stored in unopened bags, clear of the ground in cool dry conditions and protected from excessive drafts. If stored correctly and used within 6 month |
PPE Requirements | Avoid contact with eyes and skin. Wear latex gloves and protective clothing during application. |
Recommended For | Porcelain, Riven Natural Stone |
Permeable | No |
Working Time | 15 Minutes @ 20˚C |
Install Preparation | It can help to dampen natural paving before grouting to help reduce the risk of picture framing. Prior to grouting the open grout joints clean, dry and free of residues. Porous or textured tiles/slabs may require sealing before grouting with a suitable im |
---|---|
Equipment Required | Buckets, paddle mixer, water, rubber squeegee, trowel, pointing tool, adjustable hose attachment |
Joint Width | Minimum 5mm |
Pointing Preparation | It is recommended to wait at least 7-14 days before pointing. It can help to dampen natural paving before grouting to help reduce the risk of picture framing. Prior to grouting the open grout joints clean, dry and free of residues. Porous or textured tiles/slabs may require sealing before grouting with a suitable impregnating sealer. If in doubt trial an inconspicuous area to check for staining and correct colour before commencing. Once the paving is ready to receive the grout the following method must be adhered to: Immediately prior to jointing it must be ensured that the joints are free from debris and all ponded water removed. The paving surface and joints must be pre-soaked and kept wet until the jointing process has been completed. |
Mixing | A 25kg bag requires 4.25 litres of water and must be mixed for between 3 and 5 minutes until a smooth lump-free consistency has been achieved. |
Application Process | Apply the mortar without delay. Do not store liquid mortar other than in transit from mixer. It must be carefully forced into the joints using a suitable rubber squeegee. The mortar should be constantly moved over the surface to repeatedly top up joints in which the mortar may have slumped following initial placement. Use the rubber squeegee to remove as much mortar as possible from the surface. The surface must be kept constantly moist using a soft spray of water. When the jointing mortar has hardened sufficiently or achieved its initial set the paving surface must be cleaned using a brush and copious amounts of water. Cleaning must be carried out thoroughly and no mortar must be allowed to remain on the surface of the paving. Refer to the product guide for further information. |
Cleaning Tools | Wash all tools frequently to avoid material bonding to them |
Cleaning During Application | Always keep a clean sponge and water available for wiping off any excess or spillages from paving |
£10 standard courier charge up to 25kg
£20 standard courier charge up to 50kg
£35 per micro pallet charge up to 250kg per pallet
£50 per pallet charge up to 1000kg per pallet
Choose your delivery date when checking out. Timed slots are not available.
Free* next day delivery available to certain postcodes. (*T&C's apply)
Cancel up to 14 days from the date of delivery. Products to be returned in the same condition and packaging. No returns for bespoke or pre-sealed items.
You will be responsible for returning the material to London Stone. Collection can be made by us but this will incur a collection cost.