Terrace Foot

Terrace Foot

Available in 5–10 working days
Item available online only — not on display in showrooms.

Options Available

Installing metal garden screens is quick and simple. The Terrace Foot is used when the panels are being fitted to paving or a concrete base. When installing the panels, the first step is to decide the orientation of the posts and cut them to length if necessary. Next drill into the inside face of each post at 110mm from top of post and 880mm from top of post. Then attach the clamp to the posts. The next step is to install the posts. Carefully measure the run of the posts and dig holes into the ground and use postcrete to fix, be sure to check the tops of the posts are level. Finally, the panel needs to be attached. Put the end caps loosely on the posts to act as a levelling guide. Present the panel to the open back of the clamp sand then fix the back section of the clamp.